Mecidiyeköy Viaduct
Project Description:
861 m long, pretensioned viaduct
The Mecidiyekoy Viaduct is located on the Circular Road (Cevreyolu / E-5). The E-5 Circular Road consists the most important trunk of traffic flow, both for Istanbul City and the nation. The road becomes of a vital demand in case of tragic earthquake, to let emergency vehicles and relief team to flow.
Completed task:
Quality control, Project management, Construction supervision services and rearrangement of design and erection documents according to local conditions for steel jacketing of the piers, RC Lining reinforcement at the pier bottoms, placement of damping devices as isolation bearings at pier tops
